Development, construction, financing, and operation of two solar plants with a
total installed capacity of 210 MW. Spread across 392 hectares, the facilities
include 320,000 photovoltaic panels, an electrical substation, and 9 km of high-
voltage transmission line connecting to the Pecém II substation.
They are expected to generate 465 GWh of clean energy annually, enough to supply
273,500 Brazilian households and prevent the emission of more than 45,800 tonnes of
CO₂ per year.
Lins Photovoltaic Plant
-
Location
Ceará, Brazil
-
Activity
Investments in assets, Renewable Energy Plants
-
Client
Own development






Projects related to
Carousel with images of the project.
{:es}Para ofrecer las mejores experiencias, utilizamos tecnologías como las cookies para almacenar y/o acceder a la información del dispositivo. El consentimiento de estas tecnologías nos permitirá procesar datos como el comportamiento de navegación o las identificaciones únicas en este sitio. No consentir o retirar el consentimiento, puede afectar negativamente a ciertas características y funciones.{:}{:en}To provide the best experiences, we use technologies such as cookies to store and/or access information on your device. Consent for these technologies will allow us to process data such as browsing behaviour or unique identifiers on this site. Should you withhold or withdraw your consent, this may adversely affect certain features and functions.{:}{:fr}Afin de garantir une expérience de qualité, nous utilisons des technologies telles que les cookies pour stocker des informations sur l'appareil ou accéder à celles-ci. Le consentement à ces technologies nous permettra de traiter des données telles que le comportement de navigation ou des identifiants uniques sur ce site. Le fait de ne pas donner son accord ou de retirer son consentement peut affecter négativement certaines caractéristiques et fonctions.{:}