{"id":626,"date":"2023-09-15T00:00:09","date_gmt":"2023-09-14T22:00:09","guid":{"rendered":"https:\/\/cobrais.saotech.es\/?p=626"},"modified":"2024-11-06T17:40:57","modified_gmt":"2024-11-06T16:40:57","slug":"cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza","status":"publish","type":"post","link":"https:\/\/www.iscobra.com\/en\/cobra-is-is-awarded-a-power-interconnection-project-for-renewables-in-the-spanish-province-of-zaragoza\/","title":{"rendered":"COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">COBRA IS, through its Cobra Group subsidiary, has been awarded an electricity interconnection contract for wind renewable infrastructures, by Repsol Renovables the \u201cgreen\u201d subsidiary of the energy and petrochemical multinational Repsol, located in the municipalities of Fuendetodos, La Puebla de Albort\u00f3n, Valmadrid and Zaragoza, in the Spanish province of Zaragoza.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project encompasses the engineering, supply, construction and commissioning of several transmission lines of between 132 and 220 kV and the Canteras 132\/30 kV electrical substation, which is needed for the transmission of the green energy produced at the 49.5 MW Canteras I and Canteras II wind farms, which are part of the Delta II Project, Repsol&#8217;s largest renewable energy project to date. The project includes the construction of the necessary evacuation infrastructure for future wind farms in the 450 MW area.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The transmission project will convey the renewable energy produced at the wind farms and meet the clean energy demand of around 225,000 households. The development of this major electricity infrastructure project is considered essential to Cobra IS&#8217;s commitment to renewable infrastructures, and is an active component of Repsol&#8217;s strategy for achieving zero net emissions by 2050.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work is scheduled to begin in 2023, and the power infrastructure is expected to be commissioned gradually from October 2024, with completion planned for 2025.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>COBRA IS, through its Cobra Group subsidiary, has been awarded an electricity interconnection contract for wind renewable infrastructures, by Repsol Renovables the \u201cgreen\u201d subsidiary of the energy and petrochemical multinational Repsol, located in the municipalities of Fuendetodos, La Puebla de Albort\u00f3n, Valmadrid and Zaragoza, in the Spanish province of Zaragoza. The project encompasses the engineering, [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":712,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[34],"tags":[36,39],"class_list":["post-626","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicados-de-prensa","tag-adjudicaciones","tag-sostenibilidad"],"translation":{"provider":"WPGlobus","version":"3.0.2","language":"en","enabled_languages":["es","en","fr"],"languages":{"es":{"title":true,"content":true,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false},"fr":{"title":true,"content":true,"excerpt":false}}},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza - Cobra IS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza - Cobra IS\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/\" \/>\n<meta property=\"og:site_name\" content=\"Cobra IS\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-14T22:00:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-06T16:40:57+00:00\" \/>\n<meta name=\"author\" content=\"Daniel Soto\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Daniel Soto\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/\"},\"author\":{\"name\":\"Daniel Soto\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#\\\/schema\\\/person\\\/d028ef0194b488f08765e01655f1e922\"},\"headline\":\"COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza\",\"datePublished\":\"2023-09-14T22:00:09+00:00\",\"dateModified\":\"2024-11-06T16:40:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/\"},\"wordCount\":766,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/actualidad-logo-cobrais.svg\",\"keywords\":[\"Awards\",\"Sustainability\"],\"articleSection\":[\"Press releases\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/\",\"name\":\"COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza - Cobra IS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/actualidad-logo-cobrais.svg\",\"datePublished\":\"2023-09-14T22:00:09+00:00\",\"dateModified\":\"2024-11-06T16:40:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/actualidad-logo-cobrais.svg\",\"contentUrl\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/actualidad-logo-cobrais.svg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.iscobra.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"COBRA IS se adjudica un proyecto de interconexi\u00f3n el\u00e9ctrica para renovables en la provincia espa\u00f1ola de Zaragoza\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#website\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/\",\"name\":\"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}\",\"description\":\"Historical benchmark in applied industrial engineering and global services.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.iscobra.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#organization\",\"name\":\"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/logo-color-cobrais.svg\",\"contentUrl\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/logo-color-cobrais.svg\",\"caption\":\"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}\"},\"image\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#\\\/schema\\\/person\\\/d028ef0194b488f08765e01655f1e922\",\"name\":\"Daniel Soto\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"caption\":\"Daniel Soto\"},\"url\":\"https:\\\/\\\/www.iscobra.com\\\/en\\\/author\\\/daniel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza - Cobra IS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/","og_locale":"en_US","og_type":"article","og_title":"COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza - Cobra IS","og_url":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/","og_site_name":"Cobra IS","article_published_time":"2023-09-14T22:00:09+00:00","article_modified_time":"2024-11-06T16:40:57+00:00","author":"Daniel Soto","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Daniel Soto","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/#article","isPartOf":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/"},"author":{"name":"Daniel Soto","@id":"https:\/\/www.iscobra.com\/#\/schema\/person\/d028ef0194b488f08765e01655f1e922"},"headline":"COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza","datePublished":"2023-09-14T22:00:09+00:00","dateModified":"2024-11-06T16:40:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/"},"wordCount":766,"commentCount":0,"publisher":{"@id":"https:\/\/www.iscobra.com\/#organization"},"image":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/#primaryimage"},"thumbnailUrl":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/07\/actualidad-logo-cobrais.svg","keywords":["Awards","Sustainability"],"articleSection":["Press releases"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/","url":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/","name":"COBRA IS is awarded a power interconnection project for renewables in the Spanish province of Zaragoza - Cobra IS","isPartOf":{"@id":"https:\/\/www.iscobra.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/#primaryimage"},"image":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/#primaryimage"},"thumbnailUrl":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/07\/actualidad-logo-cobrais.svg","datePublished":"2023-09-14T22:00:09+00:00","dateModified":"2024-11-06T16:40:57+00:00","breadcrumb":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/#primaryimage","url":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/07\/actualidad-logo-cobrais.svg","contentUrl":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/07\/actualidad-logo-cobrais.svg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-un-proyecto-de-interconexion-electrica-para-renovables-en-la-provincia-espanola-de-zaragoza\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.iscobra.com\/"},{"@type":"ListItem","position":2,"name":"COBRA IS se adjudica un proyecto de interconexi\u00f3n el\u00e9ctrica para renovables en la provincia espa\u00f1ola de Zaragoza"}]},{"@type":"WebSite","@id":"https:\/\/www.iscobra.com\/#website","url":"https:\/\/www.iscobra.com\/","name":"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}","description":"Historical benchmark in applied industrial engineering and global services.","publisher":{"@id":"https:\/\/www.iscobra.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.iscobra.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.iscobra.com\/#organization","name":"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}","url":"https:\/\/www.iscobra.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.iscobra.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/05\/logo-color-cobrais.svg","contentUrl":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/05\/logo-color-cobrais.svg","caption":"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}"},"image":{"@id":"https:\/\/www.iscobra.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.iscobra.com\/#\/schema\/person\/d028ef0194b488f08765e01655f1e922","name":"Daniel Soto","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","caption":"Daniel Soto"},"url":"https:\/\/www.iscobra.com\/en\/author\/daniel\/"}]}},"_links":{"self":[{"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/posts\/626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/comments?post=626"}],"version-history":[{"count":3,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/posts\/626\/revisions"}],"predecessor-version":[{"id":2396,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/posts\/626\/revisions\/2396"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/media\/712"}],"wp:attachment":[{"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/media?parent=626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/categories?post=626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/tags?post=626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}