{"id":678,"date":"2024-07-02T00:00:51","date_gmt":"2024-07-01T22:00:51","guid":{"rendered":"https:\/\/cobrais.saotech.es\/?p=678"},"modified":"2024-11-06T17:54:23","modified_gmt":"2024-11-06T16:54:23","slug":"cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda","status":"publish","type":"post","link":"https:\/\/www.iscobra.com\/en\/cobra-is-wins-299-mw-poolbeg-open-cycle-power-plant-to-facilitate-further-integration-of-renewables-in-ireland\/","title":{"rendered":"COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland"},"content":{"rendered":"\n<p>The construction of this plant will enhance the operational flexibility and stability of the Irish power grid with increasing penetration of renewable energy sources.<\/p>\n\n\n\n<p>COBRA IS, through its subsidiary the Cobra Group and in a consortium with Ansaldo Energ\u00eda, has been awarded a contract for the construction of the 299 MW Poolbeg open cycle power plant by the Irish Electricity Supply Board (ESB). The project is located next to the sea port in Dublin, Ireland.<\/p>\n\n\n\n<p>This large-scale project includes all engineering, construction, supply of materials and equipment, as well as the operation and maintenance of the plant. The plant will be fitted with a state-of-the-art AE94.3A gas turbine and associated generator, providing a total capacity of 299 MW. This additional capacity will mean that the Irish power grid can provide more power from renewable energy sources, acting as a crucial back-up generator.<\/p>\n\n\n\n<p>The plant is scheduled for completion in early 2027 and is expected to make a significant contribution to Ireland&#8217;s energy infrastructure, by enhancing the stability and resilience of the country&#8217;s power grid. The addition of this new plant will help meet growing energy demand and facilitate greater integration of renewable energy, thus promoting a more sustainable and reliable energy system.<\/p>\n\n\n\n<p>The Cobra Group has extensive experience in the construction of both open cycle and combined cycle power plants. Throughout its history, it has built approximately 11 GW of installed capacity in several countries, including Spain, Mexico, Portugal, Ireland, Germany, Peru, Brazil, C\u00f4te d&#8217;Ivoire and Belgium. This experience and technical capacity consolidate the Cobra Group\u2019s status as an international benchmark in the energy sector.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction of this plant will enhance the operational flexibility and stability of the Irish power grid with increasing penetration of renewable energy sources. COBRA IS, through its subsidiary the Cobra Group and in a consortium with Ansaldo Energ\u00eda, has been awarded a contract for the construction of the 299 MW Poolbeg open cycle power [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":2266,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[34],"tags":[36,39],"class_list":["post-678","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicados-de-prensa","tag-adjudicaciones","tag-sostenibilidad"],"translation":{"provider":"WPGlobus","version":"3.0.2","language":"en","enabled_languages":["es","en","fr"],"languages":{"es":{"title":true,"content":true,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false},"fr":{"title":true,"content":true,"excerpt":false}}},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland - Cobra IS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland - Cobra IS\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/\" \/>\n<meta property=\"og:site_name\" content=\"Cobra IS\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-01T22:00:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-06T16:54:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/10\/central-de-ciclo-abierto-poolbeg.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1336\" \/>\n\t<meta property=\"og:image:height\" content=\"870\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Daniel Soto\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Daniel Soto\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/\"},\"author\":{\"name\":\"Daniel Soto\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#\\\/schema\\\/person\\\/d028ef0194b488f08765e01655f1e922\"},\"headline\":\"COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland\",\"datePublished\":\"2024-07-01T22:00:51+00:00\",\"dateModified\":\"2024-11-06T16:54:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/\"},\"wordCount\":977,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/central-de-ciclo-abierto-poolbeg.jpg\",\"keywords\":[\"Awards\",\"Sustainability\"],\"articleSection\":[\"Press releases\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/\",\"name\":\"COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland - Cobra IS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/central-de-ciclo-abierto-poolbeg.jpg\",\"datePublished\":\"2024-07-01T22:00:51+00:00\",\"dateModified\":\"2024-11-06T16:54:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/central-de-ciclo-abierto-poolbeg.jpg\",\"contentUrl\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/central-de-ciclo-abierto-poolbeg.jpg\",\"width\":1336,\"height\":870,\"caption\":\"central-de-ciclo-abierto-poolbeg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.iscobra.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"COBRA IS se adjudica la central de ciclo abierto Poolbeg de 299 MW que facilitar\u00e1 una mayor integraci\u00f3n de renovables en Irlanda\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#website\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/\",\"name\":\"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}\",\"description\":\"Historical benchmark in applied industrial engineering and global services.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.iscobra.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#organization\",\"name\":\"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/logo-color-cobrais.svg\",\"contentUrl\":\"https:\\\/\\\/www.iscobra.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/logo-color-cobrais.svg\",\"caption\":\"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}\"},\"image\":{\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.iscobra.com\\\/#\\\/schema\\\/person\\\/d028ef0194b488f08765e01655f1e922\",\"name\":\"Daniel Soto\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g\",\"caption\":\"Daniel Soto\"},\"url\":\"https:\\\/\\\/www.iscobra.com\\\/en\\\/author\\\/daniel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland - Cobra IS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/","og_locale":"en_US","og_type":"article","og_title":"COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland - Cobra IS","og_url":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/","og_site_name":"Cobra IS","article_published_time":"2024-07-01T22:00:51+00:00","article_modified_time":"2024-11-06T16:54:23+00:00","og_image":[{"width":1336,"height":870,"url":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/10\/central-de-ciclo-abierto-poolbeg.jpg","type":"image\/jpeg"}],"author":"Daniel Soto","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Daniel Soto","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/#article","isPartOf":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/"},"author":{"name":"Daniel Soto","@id":"https:\/\/www.iscobra.com\/#\/schema\/person\/d028ef0194b488f08765e01655f1e922"},"headline":"COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland","datePublished":"2024-07-01T22:00:51+00:00","dateModified":"2024-11-06T16:54:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/"},"wordCount":977,"commentCount":0,"publisher":{"@id":"https:\/\/www.iscobra.com\/#organization"},"image":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/#primaryimage"},"thumbnailUrl":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/10\/central-de-ciclo-abierto-poolbeg.jpg","keywords":["Awards","Sustainability"],"articleSection":["Press releases"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/","url":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/","name":"COBRA IS wins 299 MW Poolbeg open cycle power plant to facilitate further integration of renewables in Ireland - Cobra IS","isPartOf":{"@id":"https:\/\/www.iscobra.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/#primaryimage"},"image":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/#primaryimage"},"thumbnailUrl":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/10\/central-de-ciclo-abierto-poolbeg.jpg","datePublished":"2024-07-01T22:00:51+00:00","dateModified":"2024-11-06T16:54:23+00:00","breadcrumb":{"@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/#primaryimage","url":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/10\/central-de-ciclo-abierto-poolbeg.jpg","contentUrl":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/10\/central-de-ciclo-abierto-poolbeg.jpg","width":1336,"height":870,"caption":"central-de-ciclo-abierto-poolbeg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.iscobra.com\/cobra-is-se-adjudica-la-central-de-ciclo-abierto-poolbeg-de-299-mw-que-facilitara-una-mayor-integracion-de-renovables-en-irlanda\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.iscobra.com\/"},{"@type":"ListItem","position":2,"name":"COBRA IS se adjudica la central de ciclo abierto Poolbeg de 299 MW que facilitar\u00e1 una mayor integraci\u00f3n de renovables en Irlanda"}]},{"@type":"WebSite","@id":"https:\/\/www.iscobra.com\/#website","url":"https:\/\/www.iscobra.com\/","name":"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}","description":"Historical benchmark in applied industrial engineering and global services.","publisher":{"@id":"https:\/\/www.iscobra.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.iscobra.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.iscobra.com\/#organization","name":"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}","url":"https:\/\/www.iscobra.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.iscobra.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/05\/logo-color-cobrais.svg","contentUrl":"https:\/\/www.iscobra.com\/wp-content\/uploads\/2024\/05\/logo-color-cobrais.svg","caption":"{:es}Cobra IS{:}{:en}Cobra IS{:}{:fr}Cobra IS{:}"},"image":{"@id":"https:\/\/www.iscobra.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.iscobra.com\/#\/schema\/person\/d028ef0194b488f08765e01655f1e922","name":"Daniel Soto","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/05f217330ea9bcdbb98d857959a85ddd47202085a67870318fdbd55a5901fb53?s=96&d=mm&r=g","caption":"Daniel Soto"},"url":"https:\/\/www.iscobra.com\/en\/author\/daniel\/"}]}},"_links":{"self":[{"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/posts\/678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/comments?post=678"}],"version-history":[{"count":4,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/posts\/678\/revisions"}],"predecessor-version":[{"id":2402,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/posts\/678\/revisions\/2402"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/media\/2266"}],"wp:attachment":[{"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/media?parent=678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/categories?post=678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iscobra.com\/en\/wp-json\/wp\/v2\/tags?post=678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}